One stop service for hotel project furniture

You are here:Home » Project » Marriott Hotel
Marriott Hotel

Customer

Marriott Hotel

Requirement

Furniture including: headboard, bed frame, nightstands, lounge chaise chair, coffee table,wardrobe, luggage rack, Wall panel, cladding, loose furniture for restaurant, lounge area and public area.

Star standard: five star;


Material Requirement

Veneer: oak wood veneer;

Solid wood: natural solid oak wood;

Hardware: HAFELE brand;

Solutions

We tried our best to search for materials that match the specifications with the best prices. 

Our designer went to the hotel to take measurements, so as to reduce the size error of the furniture.

The installation problem was solved by sending workers to the site for installation.

Project Time Line

Project Time Line

June 2017: Received the inquiry.

July 2017: The hotel owner visited our factory and discussed the details for the samples.

July 2017: Made a mock room in our factory for the project.

Aug. 2017: The hotel owner came to our factory to check the quality of samples.

Sept. 2017: Made a deal and confirmed the material and drawing.

Sept. 2017: Mass production.

Dec. 2018: Delivered the furniture to the Malaysia.

April 2018: Our workers went to the local and installed the furniture.

June 2018: Hotel opened.